Requested by a long standing customer to facilitate the relocation of their print room.

Our team at Alphatec 2000 started with a pre-arranged site visit to determine the scope of the work required.

During the scheduled days, our team managed the following:

  • Power Arrangements
  • All mechanical work
  • All electrical services
  • Machinery dismantling
  • Machinery moving to new location.
  • Machinery levelling
  • Service of all system
  • Safety checks

The systems were put in place and fully operational ahead of our planned scheduled time.